monolithic ceramic tile sample simple display rack-e2017
We finish the E2017 in matte black as standard because it does not compete visually with tile colors. Custom RAL color matching is available for branded showroom environments.
Showing 541–555 of 660 resultsSorted by latest

We finish the E2017 in matte black as standard because it does not compete visually with tile colors. Custom RAL color matching is available for branded showroom environments.

Assembly hardware for the E2016 is all M8 stainless steel — standard size, won’t rust, and fits the hex key included in every box. Most showrooms have the rack up in under 20 minutes.

The slot liners on the E2018 are made from EPDM rubber, the same material used in automotive weather seals. They do not harden, crack, or leave marks on your tile edges.

We manufacture the CT2166 in our Xiamen facility where we control every step from steel procurement to final assembly. No subcontractors, no quality gaps.

Every CT2130 ships with a printed assembly guide that uses only pictures — no English required. We have shipped to 50+ countries and the feedback on our instructions has been universally positive.

We keep the CT2163 in stock across 3 standard widths and 5 slot configurations. Most orders ship within 7 business days because we build frames ahead of demand.

The E2136 was field-tested for 18 months in a high-traffic Dubai showroom before we released the design. Every improvement between prototype and production came from watching real customers interact w

We manufacture the E2073 in our Xiamen facility where we control every step from steel procurement to final assembly. No subcontractors, no quality gaps.

If your sales team spends more time fetching samples from the back than talking to customers, the E2116 puts your entire collection at their fingertips — literally within arm’s reach of the consultati

Every E2115 ships with a printed assembly guide that uses only pictures — no English required. We have shipped to 50+ countries and the feedback on our instructions has been universally positive.

We designed the E2144 after visiting 30+ tile showrooms and noticing the same bottleneck: staff wasting time lifting heavy sample boards. This rack lets one person reorganize an entire display wall in

We pre-drill and tap every threaded insert on the E2133 before finishing, so the powder coat never fills the threads. Your assembly bolts go in clean every time.

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The E2132 undergoes a 72-hour salt spray test before it leaves our facility.

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The CF2050 undergoes a 72-hour salt spray test before it leaves our facility.

The E2146 frame is engineered with a center of gravity 40% below the midpoint. Even with all sample panels pulled out simultaneously, the rack stays planted.