wall ceramic tile display rack stone display stand-SG031
Every SG031 ships with a printed assembly guide that uses only pictures — no English required. We have shipped to 50+ countries and the feedback on our instructions has been universally positive.
SG031 Product Overview
We finish the SG031 in matte black as standard because it does not compete visually with tile colors. Custom RAL color matching is available for branded showroom environments.
Every SG031 ships with a printed assembly guide that uses only pictures — no English required. We have shipped to 50+ countries and the feedback on our instructions has been universally positive.
The biggest complaint we heard from distributors was display racks that developed a ‘lean’ after 6 months. The SG031 has gusseted corner plates and cross-braced rear panels that eliminate frame racking.
If your sales team spends more time fetching samples from the back than talking to customers, the SG031 puts your entire collection at their fingertips — literally within arm’s reach of the consultation desk.
Key Features
- Cold-rolled steel main frame with full-length internal reinforcement ribs
- Removable end caps allow infinite row extension by bolting additional units together
- Cross-braced rear panel eliminates side-to-side sway when panels are being browsed
- Push-pull rail mechanism rated at 50kg per rail — keeps heavy slabs gliding smoothly after years of daily use
- Modular end-frames bolt together in any combination — start with 8 slots, expand as your line grows
- Pre-assembled slider carriages — no loose ball bearings to deal with during setup
- Stainless steel ball-bearing sliders with dampened stops — panels glide, then lock into viewing position without slamming
- Slot-to-slot spacing adjustable from 15mm to 45mm without disassembly
Why Buy Direct from Tsianfan
- Engineering support included at no charge — send us your floor plan for an optimized layout proposal
- 11 years manufacturing display systems exclusively for the building materials industry
- We own the factory in Xiamen — no middlemen, no brand licensing fees, no inflated logistics charges
- Steel sourced from ISO-certified mills with full material traceability
- Custom engineering proposals delivered within 3 business days of receiving your requirements
Where This Display Rack Fits
Hotel and hospitality project material libraries
Ordering & Customization
Every order starts with your requirements — dimensions, color, capacity, branding. Contact our sales team at WhatsApp: +86 13365904989 or email: [email protected]. We prepare a detailed quotation with production timeline, typically within 24 hours. For custom sizes, include a simple sketch or reference dimensions — our engineering team handles the rest.
Common Questions
How is the rack packaged and shipped?
Steel components are foam-wrapped and packed in reinforced export cartons or plywood crates depending on order volume. We ship via sea freight FOB Xiamen, air freight, or international courier. You are welcome to use your own forwarder as well.
What surface finishing options are available?
Standard is matte black powder coating with acid pickling and anti-rust treatment. We also offer custom RAL color matching, chrome plating, and specialized coatings for outdoor or high-humidity environments.
Where is Tsianfan located and can I visit?
Our manufacturing facility is in Xiamen, Fujian, China, about 20 minutes from Xiamen Gaoqi International Airport. Factory visits are welcome — we can arrange airport pickup. We also offer live video walkthroughs during production if you prefer not to travel.
Can the SG031 be expanded later?
Most of our display racks are modular. You can bolt additional units together to create longer display walls as your product line expands. Contact us with your current configuration for expansion compatibility.
How long does delivery take?
Standard models in stock ship within 7 business days. Custom orders typically require 15-25 business days for production. Sea freight transit varies by destination — most ports in Europe, the Americas, and Southeast Asia receive shipments within 25-35 days after departure.











