Showing 81–100 of 187 resultsSorted by latest
-

We plate the EXAMPLES with a zinc-phosphate corrosion barrier before powder coating. It is the same three-stage finishing process used on outdoor architectural steel, because showroom humidity is just
-

Showroom managers love the CT632 because samples stay clean longer — the angled display means less dust settles on the tile faces, reducing daily cleaning time.
-

We keep the CT631 in stock across 3 standard widths and 5 slot configurations. Most orders ship within 7 business days because we build frames ahead of demand.
-

The CT629 frame starts as cold-rolled steel tube, cut and welded on CNC jigs to maintain consistent slot spacing across every unit. No shims, no field adjustments needed.
-

Tile samples look their best when customers can see the full face without bending or reaching. The CT628 angles every panel slightly toward the viewer, reducing glare from overhead showroom lighting.
-


We plate the CT617 with a zinc-phosphate corrosion barrier before powder coating. It is the same three-stage finishing process used on outdoor architectural steel, because showroom humidity is just as
-


Tile retailers tell us their customers make faster decisions when they can compare 6-8 slabs side by side. The CT620 enables that comparison shopping experience without requiring a warehouse-sized sho
-

Each SHOWROOMS leaves our factory with a QR-coded inspection report showing the batch number, welder ID, coating thickness measurements, and the name of the QC inspector who signed off.
-

The STAND uprights are 45×45mm square tube with 2.5mm wall thickness. We publish the cross-section spec because we want you to compare it against anything else on the market.
-

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The CT613 undergoes a 72-hour salt spray test before it leaves our facility.
-

The rail system on the CT2026 uses ball-bearing sliders rated at 10,000+ cycles. That is roughly 5 years of daily use in a busy showroom before any maintenance is needed.
-

Tile retailers tell us their customers make faster decisions when they can compare 6-8 slabs side by side. The CT2215 enables that comparison shopping experience without requiring a warehouse-sized sh
-

The D2019 frame is engineered with a center of gravity 40% below the midpoint. Even with all sample panels pulled out simultaneously, the rack stays planted.
-

The E042 frame is engineered with a center of gravity 40% below the midpoint. Even with all sample panels pulled out simultaneously, the rack stays planted.
-

We pre-drill and tap every threaded insert on the CD2006 before finishing, so the powder coat never fills the threads. Your assembly bolts go in clean every time.
-

The CT2135 frame is engineered with a center of gravity 40% below the midpoint. Even with all sample panels pulled out simultaneously, the rack stays planted.
-

Quartz, granite, and marble each have different weight characteristics. The CD2007 slot geometry was optimized for the average density range of natural and engineered stone, with extra reinforcement a
-

Every CD901 ships with a printed assembly guide that uses only pictures — no English required. We have shipped to 50+ countries and the feedback on our instructions has been universally positive.
-

The CT001 was field-tested for 18 months in a high-traffic Dubai showroom before we released the design. Every improvement between prototype and production came from watching real customers interact w
-

Assembly hardware for the CT912 is all M8 stainless steel — standard size, won’t rust, and fits the hex key included in every box. Most showrooms have the rack up in under 20 minutes.