Mosaic ceramic tile sample stone roof type display frame double-sided display frame-ML057
Showroom managers love the ML057 because samples stay clean longer — the angled display means less dust settles on the tile faces, reducing daily cleaning time.
ML057 Product Overview
We finish the ML057 in matte black as standard because it does not compete visually with tile colors. Custom RAL color matching is available for branded showroom environments.
We plate the ML057 with a zinc-phosphate corrosion barrier before powder coating. It is the same three-stage finishing process used on outdoor architectural steel, because showroom humidity is just as unforgiving.
If your sales team spends more time fetching samples from the back than talking to customers, the ML057 puts your entire collection at their fingertips — literally within arm’s reach of the consultation desk.
The biggest complaint we heard from distributors was display racks that developed a ‘lean’ after 6 months. The ML057 has gusseted corner plates and cross-braced rear panels that eliminate frame racking.
Key Features
- Push-pull rail mechanism rated at 50kg per rail — keeps heavy slabs gliding smoothly after years of daily use
- Tool-free slot adjustment — lift the bracket, slide to desired position, release to lock
- Pre-drilled cable management channels for showrooms that add digital screens or lighting
- Modular end-frames bolt together in any combination — start with 8 slots, expand as your line grows
- Cross-braced rear panel eliminates side-to-side sway when panels are being browsed
- EPDM rubber contact pads at all sample touch points — rated for permanent indoor use
- All fasteners are M8 stainless steel — standard size available at any hardware store worldwide
- Removable end caps allow infinite row extension by bolting additional units together
Why Buy Direct from Tsianfan
- We ship to 50+ countries with correct export documentation on every shipment
- Custom engineering proposals delivered within 3 business days of receiving your requirements
- 11 years manufacturing display systems exclusively for the building materials industry
- Factory tours welcome in person or via live video — see your order on the production line
- Every rack completes a 72-hour salt-spray corrosion test before it ships
Where This Display Rack Fits
Contractor and builder selection centers
Ordering & Customization
Every order starts with your requirements — dimensions, color, capacity, branding. Contact our sales team at WhatsApp: +86 13365904989 or email: [email protected]. We prepare a detailed quotation with production timeline, typically within 24 hours. For custom sizes, include a simple sketch or reference dimensions — our engineering team handles the rest.
Common Questions
Do you offer design assistance for showroom layouts?
Yes. Send us your floor plan with dimensions and our team will propose a rack configuration that balances product density with customer flow. This service is included at no charge for any order inquiry.
Where is Tsianfan located and can I visit?
Our manufacturing facility is in Xiamen, Fujian, China, about 20 minutes from Xiamen Gaoqi International Airport. Factory visits are welcome — we can arrange airport pickup. We also offer live video walkthroughs during production if you prefer not to travel.
Can I order the ML057 in a different size or color?
Yes. Frame dimensions, powder coat color, slot configuration, and branding are all customizable. Our engineering team reviews every request and responds with a detailed quotation, typically within 3-5 working days.
What materials can the ML057 hold?
The ML057 is designed around ceramic and porcelain tile samples. Share your sample dimensions and weight with our team, and we will confirm compatibility — usually within one business day.
How long does delivery take?
Standard models in stock ship within 7 business days. Custom orders typically require 15-25 business days for production. Sea freight transit varies by destination — most ports in Europe, the Americas, and Southeast Asia receive shipments within 25-35 days after departure.







