professional metal display stands for faucets bathroom floor drain display stand-fd2008

Inquiry

The FD2008 locking casters are TK-200 series — the same specification used in hospital equipment. Silent rolling, full-lock at pedal press, and rated for years of daily repositioning across hard floor

SKU: 735 Category:

FD2008 Product Overview

The FD2008 uses a modular rail system that accepts eight different sample holder types. Swap from tile brackets to plank shelves in about 15 minutes with nothing more than the included hex key.

We build the FD2008 from cold-rolled steel with the same cross-section specifications used in structural scaffolding. It is over-engineered for display, which means it handles years of reconfiguration without stress fractures.

Not every showroom sells a single product category. The FD2008 was designed for versatility — it handles tile, stone, wood, and laminate samples with equal reliability using interchangeable holder types.

The FD2008 locking casters are TK-200 series — the same specification used in hospital equipment. Silent rolling, full-lock at pedal press, and rated for years of daily repositioning across hard floors.

Key Features

  • Modular bolt-together design — disassemble and reassemble indefinitely without degradation
  • Cold-rolled steel throughout — superior grain structure means no fatigue fractures
  • TK-200 series locking casters — hospital-grade, silent rolling, full-lock at pedal press
  • Load-rated at 100kg per shelf — handles the heaviest stone, tile, and solid-surface samples
  • 45×45mm main uprights with internal reinforcement ribs — structural scaffolding cross-section
  • All assembly hardware is M8 stainless steel — won’t rust, won’t strip, standard tool size worldwide
  • Universal rail system accepts tile brackets, plank shelves, stone cleats, and mosaic panels
  • Interchangeable sample holders — reconfigure for different product categories without replacing the frame

Why Buy Direct from Tsianfan

  • 11 years manufacturing display systems exclusively for the building materials industry
  • Global shipping experience across 50+ countries with correct export documentation
  • Factory-direct means your order is managed end-to-end by the people who build it
  • Steel components backed by mill certification for every structural member
  • Engineering support included — send us your floor plan for an optimized rack configuration

Where This Display Rack Fits

Trade exhibition booths requiring flexible display

Ordering & Customization

Every order starts with your requirements — dimensions, color, capacity, branding. Contact our sales team at WhatsApp: +86 13365904989 or email: [email protected]. We prepare a detailed quotation with production timeline, typically within 24 hours. For custom sizes, include a simple sketch or reference dimensions — our engineering team handles the rest.

Common Questions

What materials can the FD2008 hold?

The FD2008 is designed around building material samples. Share your sample dimensions and weight with our team, and we will confirm compatibility — usually within one business day.

Can the FD2008 be expanded later?

Most of our display racks are modular. You can bolt additional units together to create longer display walls as your product line expands. Contact us with your current configuration for expansion compatibility.

How is the rack packaged and shipped?

Steel components are foam-wrapped and packed in reinforced export cartons or plywood crates depending on order volume. We ship via sea freight FOB Xiamen, air freight, or international courier. You are welcome to use your own forwarder as well.

Where is Tsianfan located and can I visit?

Our manufacturing facility is in Xiamen, Fujian, China, about 20 minutes from Xiamen Gaoqi International Airport. Factory visits are welcome — we can arrange airport pickup. We also offer live video walkthroughs during production if you prefer not to travel.

How long does delivery take?

Standard models in stock ship within 7 business days. Custom orders typically require 15-25 business days for production. Sea freight transit varies by destination — most ports in Europe, the Americas, and Southeast Asia receive shipments within 25-35 days after departure.


×
👋 Hi! Need related products?
Contact us for customization.