wall mounted art rack wire mesh display rack-sw054
Not every showroom sells a single product category. The SW054 was designed for versatility — it handles tile, stone, wood, and laminate samples with equal reliability using interchangeable holder type
SW054 Product Overview
Multi-category building material distributors face a constant challenge: how to display diverse products without buying separate display systems for each. The SW054 solves that with modular, reconfigurable hardware.
Not every showroom sells a single product category. The SW054 was designed for versatility — it handles tile, stone, wood, and laminate samples with equal reliability using interchangeable holder types.
Showroom layouts change, product lines rotate, and display fixtures need to keep up. The SW054 is designed for disassembly and reassembly — every connection is a bolt, not a weld, so you can reconfigure indefinitely.
The SW054 uses a modular rail system that accepts eight different sample holder types. Swap from tile brackets to plank shelves in about 15 minutes with nothing more than the included hex key.
Key Features
- Interchangeable sample holders — reconfigure for different product categories without replacing the frame
- Load-rated at 100kg per shelf — handles the heaviest stone, tile, and solid-surface samples
- Cold-rolled steel throughout — superior grain structure means no fatigue fractures
- TK-200 series locking casters — hospital-grade, silent rolling, full-lock at pedal press
- Modular bolt-together design — disassemble and reassemble indefinitely without degradation
- 45×45mm main uprights with internal reinforcement ribs — structural scaffolding cross-section
- Acid-washed, zinc-phosphated, then powder coated — three corrosion barriers before the color coat
- Flat-pack shipping — fits through standard doorways in its shipping carton
Why Buy Direct from Tsianfan
- Standard models ship in 7-10 business days from finished-goods inventory
- Global shipping experience across 50+ countries with correct export documentation
- Engineering support included — send us your floor plan for an optimized rack configuration
- 11 years manufacturing display systems exclusively for the building materials industry
- Steel components backed by mill certification for every structural member
Where This Display Rack Fits
Multi-category building material showrooms
Ordering & Customization
Every order starts with your requirements — dimensions, color, capacity, branding. Contact our sales team at WhatsApp: +86 13365904989 or email: [email protected]. We prepare a detailed quotation with production timeline, typically within 24 hours. For custom sizes, include a simple sketch or reference dimensions — our engineering team handles the rest.
Common Questions
Can the SW054 be expanded later?
Most of our display racks are modular. You can bolt additional units together to create longer display walls as your product line expands. Contact us with your current configuration for expansion compatibility.
Where is Tsianfan located and can I visit?
Our manufacturing facility is in Xiamen, Fujian, China, about 20 minutes from Xiamen Gaoqi International Airport. Factory visits are welcome — we can arrange airport pickup. We also offer live video walkthroughs during production if you prefer not to travel.
Do you offer design assistance for showroom layouts?
Yes. Send us your floor plan with dimensions and our team will propose a rack configuration that balances product density with customer flow. This service is included at no charge for any order inquiry.
What surface finishing options are available?
Standard is matte black powder coating with acid pickling and anti-rust treatment. We also offer custom RAL color matching, chrome plating, and specialized coatings for outdoor or high-humidity environments.
How long does delivery take?
Standard models in stock ship within 7 business days. Custom orders typically require 15-25 business days for production. Sea freight transit varies by destination — most ports in Europe, the Americas, and Southeast Asia receive shipments within 25-35 days after departure.





